Home   |   Technical Articles

Technical Articles

Comparative Tracking Index to IEC 60112: Electrode Force, Contaminant and the 50-Drop Endpoint

2026-11-16

The comparative tracking index (CTI) is quoted on every datasheet and reproduced in every insulation coordination calculation, yet it is one of the easiest tests to run inconsistently. IEC 60112 fixes the apparatus and the procedure precisely; the variation comes from how carefully the operator holds those conditions for the full 50 drops.

The measurement in one paragraph

Two platinum electrodes rest on the surface of the specimen under a defined load. A contaminant solution is dropped between them at a fixed interval while an AC voltage is applied. The test continues for 50 drops or until tracking occurs. The voltage at which tracking is avoided at 50 drops, confirmed by a second specimen, gives the CTI.

Conditions that must be held

Electrode load1.0 N per electrode. Check with a balance at the electrode tip, not at the lever.
ContaminantSolution A: 0.1 % ammonium chloride in deionised water. Concentration drift from evaporation raises conductivity and lowers CTI.
Drop interval30 s, with a tolerance that most timers meet; hand timing does not.
Drop size and heightFixed by the dosing syringe and the drop height; a partially blocked needle changes both.
Electrode conditionPlatinum, cleaned, with the specified chisel edge. Residue from the previous specimen is the single biggest cause of early tracking.

What counts as failure

Tracking is not only a visible carbon path. The standard treats any of the following as failure: a current of 0.5 A or more flowing for 2 s, persistent flaming, or the specimen burning away between the electrodes. Because the trip is current-based, the series resistor and the trip setting have to be checked before the test, not after a suspicious result.

Choosing the starting voltage

Starting too high wastes specimens; starting too low wastes time. A practical sequence is to begin near the expected class value, then step in 25 V increments. The CTI is the highest voltage at which 50 drops are survived on two specimens, with the second specimen confirming the first. Report the value and the test conditions together: a CTI of 600 measured with a diluted solution is not a CTI of 600.

Material groups and what the number is used for

Insulation coordination uses CTI to assign a material group: group I at 600 and above, group II at 400 to 599, group IIIa at 250 to 399, and IIIb below 250 in the common scheme. The group feeds directly into creepage distance selection, so an optimistic CTI shifts the whole design in the unsafe direction. Two points are worth remembering:

  • CTI is a surface property of the specimen as tested. Mould release agents, machining marks and moisture all change it.
  • Conditioning matters. Specimens are normally dried before test; a specimen pulled from a humid store will track earlier.

Five mistakes seen in round-robin tests

  1. Electrodes re-used without cleaning, so the first drop lands on carbon residue.
  2. Solution mixed by volume rather than by mass, giving a stronger or weaker contaminant.
  3. Specimen surface not horizontal, so the drop runs to one electrode.
  4. Test stopped at the first sign of bubbling rather than at the defined failure criteria.
  5. Result reported without the conditioning and the confirmed second specimen.

The electrical safety test range includes tracking and proof-voltage apparatus; related probe and gauge requirements are listed under test probes and fingers.

close
Scan the qr codeClose
the qr code